New Dispensary Update

Walls, floor and beginnings of a roof

Work slowed down a little as Habib has been busy with other things.

Nevertheless, from last week, we now have fully insulated floor and walls

(Ignore the youtube ads afterwards – nought to do with me)

And this week, the rafters for a roof:

I can already imagine bunches of drying herbs dangling from that central rafter!

About donaldpurves

Traditional Herbalist since 1989, qualified originally with National Institute of Medical Herbalists (Tutorial Course, School of Herbal Medicine/Phytotherapy), joined Unified Register of Herbal Practitioners in 2011. University lecturer in Herbal Medicine since 2005. Born and brought up in the Scottish Borders. Higher Education at University of York (Biology 1980) and Scottish School of Herbal Medicine (MSc Herbal Medicine 2003). Married to Rukshana Afia, an artist working with drawing, textiles and ceramics. Passionate about environmental, economic and social justice.
This entry was posted in Gardening, Herbs, Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.